Role: EMEA Ops / Regional Builder | Focus: Speed, Turnkey, Scale

Your Geneva HQ Doesn't Need to Take 12 Months

For EMEA Ops leaders and expansion teams opening regional headquarters. LINK provides turnkey service that compresses 12 months into 3—with owners who handle everything from permits to fit-out.

Your Reality

  • Timeline pressure.Board expects a Geneva presence in 6 months, but everyone tells you it takes 12+ months to set up an office here.
  • Coordination chaos.Who manages the architect? The contractors? The permit applications? You didn't sign up to become a Swiss construction project manager.
  • Information overload.Your inbox is flooded with broker pitches. Every building is "flexible" and "modern." They all blur together.
  • Landlord skepticism.Will the property manager actually help after you sign—or just hand over keys and disappear?
  • Scaling uncertainty.You need 500 sqm now but might need 1,500 sqm in 18 months. Most landlords want long-term commitments on fixed space.

What You Actually Want

  • A credible Geneva HQ—fast.Professional space that impresses clients and candidates, ready in 3 months, not 12.
  • To hand this off.A single point of contact who handles permits, contractors, fit-out, and coordination—so you can focus on launching the business.
  • Growth optionality.Start with what you need, scale when you need, without moving buildings.
  • No nasty surprises.Timeline that sticks, costs that don't balloon, landlord who actually delivers.
  • To be remembered as "Claire nailed Geneva."Internally, you want to be the person who set up the regional hub quickly, efficiently, and impressively.

How LINK Helps

LINK is the owner-operated building where 3-month move-ins are standard—not exceptional—because the people who built it are the people who manage your fit-out.

3-Month Move-In, Not 12

Turnkey Fit-Out Service

Most Geneva moves take 12+ months because you're coordinating 15 contractors who've never worked together. LINK's owners built the building—and the electricians, HVAC engineers, and contractors who installed every system are still on call. No learning curve. No coordination chaos.

Track record: 4 tenant fit-outs completed on schedule in 18 months. 9,500 sqm re-let in the past year.

Single Point of Contact

Owner-Operated Service Model

RI REALIM SA built LINK—and stayed. Their dedicated on-site team handles everything: consulting on plans, re-drawing layouts, permit support, contractor coordination, weekly updates. Experienced project manager. Engineer from the State of Geneva Energy Department.

You don't become a real estate expert. You hand it off and focus on launching Geneva.

Plug-In Infrastructure

Enterprise-Grade Technology & Services

Category 6 wiring, optic fiber, IT rooms with backup power, raised floors—already in place. Restaurant, cafeteria, fitness center, conference rooms with AV equipment, concierge. You don't build infrastructure from zero; you plug into what exists.

12 elevators, 5 entrances, 423 parking spaces. Future-proof from day one.

Scale Without Moving

217–2,700 sqm Flexible Floorplates

33,000 sqm building means room to grow. Start with 500 sqm, expand to 1,500 sqm without changing address. Divisible floors let you take just what you need. Existing fit-outs from previous tenants available—sometimes you skip construction entirely.

Growth flexibility built in: Companies have doubled their space at LINK without the disruption of moving.

Easy for International Teams

Your Geneva hub needs to work for local hires, visitors from HQ, and cross-border commuters from France. LINK's multi-modal connectivity means everyone has a workable commute.

  • Tram 14 & 18:50m away, Bel-Air (city center) in 18 minutes
  • Léman Express:Vernier station 300m, cross-border to France
  • Motorway:Direct A1 access, skip city traffic
  • 423 parking spaces:More than new projects can build
  • Green Way 2026:Cycling/pedestrian path connecting directly
LINK location with transport connections and travel times

Start Here

Get the tools and support to move fast on your Geneva expansion.

Geneva HQ Launch Checklist

25-item checklist from board approval to first day in office. Location evaluation, legal pitfalls, landlord questions to ask, fit-out timeline planning. Used by EMEA Ops leaders who've done this before.

Download Checklist

Request a 3-Month Timeline

Tell us your space requirements and target move-in date. We'll respond with a realistic week-by-week timeline based on our track record—including what we handle vs. what you provide.

Schedule Consultation

Ready to Move Fast?

Schedule a tour with the team who'll manage your fit-out. Bring your timeline concerns—we'll show you the track record.